Search results for "production [photon]"

showing 10 items of 138 documents

Autonomous agent system using dispatching rules in the negotiation protocol

2002

In this paper, the most important results obtained by the simulated application of autonomous agent paradigms to a. real factory are presented. The classical rules of dispatching are compared with the autonomous agents approach. In particular, the possibility of redesigning the negotiation rules in terms of currency in order to take into account even non-time-related costs is considered. Finally, a new project on the effective application of the autonomous agent system to a test bed, modelling a simplified firm, is proposed.

Operations researchComputer scienceautonomous agentnegotiation protocolmedia_common.quotation_subjectAutonomous agentnegotiation protocolsScheduling (production processes)Computer securitycomputer.software_genreautonomous agents; negotiation protocols; schedulingNegotiationautonomous agentsschedulingcomputermedia_common
researchProduct

AN OBJECT ORIENTED MODEL FOR SCHEDULING IN AGILE MANUFACTURING

2002

Agility represents a key factor in industry to handle the continuous market changes. Companies must re-organize their activities to be agile and competitive in such a dynamic environment. In particular, production planning and control tools are very important to optimize the manufacturing process responsiveness to sudden changes in customer demand. In this paper, an attempt has been made to develop an object-oriented software architecture that allows the optimal line organization to be determined once a set of parts to be produced has been ordered. An optimization module represented by a simulated annealing algorithm has been interfaced with an object oriented architecture to build up a fr…

OptimizationEngineeringSchedulingbusiness.industryStrategy and ManagementDistributed computingReal-time computingScheduling (production processes)ReconfigurabilityAgile manufacturingIndustrial and Manufacturing EngineeringComputer Science ApplicationsObject-oriented designScheduling; Objected oriented design; OptimizationObjected oriented designProduction planningSimulated annealingbusinessSoftware architectureAgile software developmentJournal of Advanced Manufacturing Systems
researchProduct

Managing electrical energy storage systems and shiftable loads with an innovative approach in energy districts

2014

In this work, a power dispatch problem for a system composed of an aggregate of loads and an electrical energy storage system is considered. The approach to solve the optimal dispatch is innovative and shows good performances in limited calculation times. According to the more recent indications coming from the European distributors, the architecture for energy dispatch at distribution level will be hierarchical. The 'Aggregator' is the interface between groups of loads and the energy distributor and sends the individual consumers the desired load profiles, following which the user may gets a discount on the energy bill. On the other hand, the energy tariff may follow a given daily profile …

OptimizationOptimization;management of resources;shiftable loadsOptimization management of resources shiftable loadsComputer scienceScheduling (production processes)Economic dispatchAutomotive engineeringEnergy storagemanagement of resourcesPower (physics)Settore ING-IND/33 - Sistemi Elettrici Per L'Energiahiftable loadsEnergy profileWork (electrical)Intermittent energy sourceshiftable loadsmanagement of resourceSimulationEnergy (signal processing)
researchProduct

Costs, revenues and incomes of Sicilian farms that cultivate cactus pear

2015

Sicily, placed at the center of the Mediterranean, for its favorable soil and climatic conditions, represents the main production area of cactus pear (Opuntia ficus-indica L. Miller) in Italy. In this context, the paper aims to estimate production costs, revenues and incomes of the Sicilian farms that cultivate cactus pear. The economic analysis has been carried out in the area of Santa Margherita Belice (AG), where the cultivation of cactus pear assumes a significant importance for the economy of the territory and where in last years many farmers have implanted specialized plantations also for the support granted by the EU agricultural policy. Economic analysis has involved 20 farms specia…

PEAREconomic analysiForestryHorticultureMarketlanguage.human_languageAgricultural economicsProduction proceGeographyScozzolaturaSustainabilityCactusSustainabilitySettore AGR/01 - Economia Ed Estimo RuralelanguageEconomic analysisRevenueProfitability indexProfitabilitySicilian
researchProduct

Determinants of elimination decisions in the activity scheduling process

2016

[EN] This paper presents an analysis on the determinants related to a particular rescheduling decision in the activity-travel scheduling process: elimination decisions, which consist in the non-execution of pre-planned activity-travel episodes. Data used come from an in-depth computer-assisted telephone interview (CATI) follow up survey carried out during the implementation of the first wave of an activity scheduling process panel survey. Open-ended answers related to the reasons associated to changes between pre-planned and executed agenda are studied. First, an interpretative qualitative method based on analytic induction (AI) is used to cope with the complex nature of the rescheduling de…

Panel surveyEngineeringOperations research0211 other engineering and technologiesScheduling (production processes)Transportation02 engineering and technologyINGENIERIA E INFRAESTRUCTURA DE LOS TRANSPORTESQualitative analysis0502 economics and businessActivity-based analysisFollow up survey050210 logistics & transportationbusiness.industryQualitative and quantitative study05 social sciencesActivity rescheduling decisions021107 urban & regional planningActivity schedulingQualitative analytic inductionEconometric modelTelephone interviewAnalytic inductionActivity scheduling processbusiness
researchProduct

Changes in the Scheduling Process According to Observed Activity-travel Flexibility

2014

Abstract In this work we analyze the reasons for changing pre-planned activities and travels episodes considering the type of modification observed during the scheduling process. Specifically we selected a small sample from those pre-planned episodes that are no executed at all as a pilot study. The data analyzed was collected in the first wave of a weekly activity-travel panel survey carried out in Valencia (Spain) in 2010. Each survey wave consisted on a face-to-face interview to generate a pre-planned activity agenda for the following week, an activity-travel diary implemented on mobile phones to collect activities and travels as they are executed, and in-depth telephone interviews to in…

Panel surveyEngineeringbusiness.industryResource constraintsActivity Scheduling ProcessScheduling (production processes)Small sampleRescheduling analysisINGENIERIA E INFRAESTRUCTURA DE LOS TRANSPORTESQualitative analysisCategorizationGeneral Materials ScienceOperations managementQualitative AnalysisbusinessProcedia - Social and Behavioral Sciences
researchProduct

Identification of linear parameter varying models

2003

We consider the problem of identifying discrete-time linear parameter varying models of nonlinear or time-varying systems. We assume that inputs, outputs and the scheduling parameters are measured, and a form of the functional dependence of the coefficients on the parameters. We show how the identification problem can be reduced to a linear regression, and we give conditions on persistency of excitation in terms of the inputs and parameter trajectories.

Parameter identification problemNonlinear systemIdentification (information)Control theoryMatrix algebraLinear regressionLinear systemScheduling (production processes)Applied mathematicsExcitationMathematics
researchProduct

Simultaneous optimization of harvest schedule and data quality

2015

In many recent studies, the value of forest inventory information in harvest scheduling has been examined. In a previous paper, we demonstrated that making measurement decisions for stands for which the harvest decision is uncertain simultaneously with the harvest decisions may be highly profitable. In that study, the quality of additional measurements was not a decision variable, and the only options were between making no measurements or measuring perfect information. In this study, we introduce data quality into the decision problem, i.e., the decisionmaker can select between making imperfect or perfect measurements. The imperfect information is obtained with a specific scenario tree fo…

Pareto optimalityGlobal and Planetary ChangeForest inventoryEcologyOperations researchComputer sciencebi-objective optimizationpäätöksentekoPerfect informationScheduling (production processes)ForestryDecision problemMulti-objective optimizationstochastic optpmizationInformation economicsmulti-objective optimizationData qualityinformation economicsdata qualityStochastic optimizationforest inventoryconstraints
researchProduct

Power dispatching techniques as a finite state machine for a standalone photovoltaic system with a hybrid energy storage

2020

Standalone photovoltaic system (SPVS) is usually embedded with an energy storage unit to overcome the intermittency of photovoltaic (PV) generation as well as to address load variations in off-grid operation. In SPVS energy systems, batteries can serve as the long term energy storage and contributing to the large portion of the energy demand but to overcome the load intermittency, it necessitates a fast response energy storage embedded with the battery as a hybrid energy storage (HES) for dynamic loads (e.g., Electric Vehicle loads, emergency power management). In this work, Lead-Acid (LA) battery and supper capacitor (SC) array are used as the HES. HES helps not only in increasing more uti…

Power managementBattery (electricity)business.product_categoryRenewable Energy Sustainability and the EnvironmentComputer sciencePhotovoltaic systemVDP::Technology: 500finite state machineEnergy Engineering and Power TechnologyEnergy storageAutomotive engineeringPower (physics)law.inventionlcsh:Production of electric energy or power. Powerplants. Central stationsCapacitorFuel Technologylawlcsh:TK1001-1841Electric vehiclestandalone photovoltaic systempower managementhybrid energy storagebusinessdc micro gridVoltage
researchProduct

Negotiation mechanisms for capacity allocation in distributed enterprises

2003

Abstract The paper proposes an agent based approach for the capacity allocation in distributed enterprises, characterized by complex and articulated organizations and by geographically distributed production capacities contended by many product families. In such a scenario the process of allocating the production capacity to the single customer order is one the major bottlenecks of the production planning activity as far as many organizational decisional levels are involved and market turbulence implies a continuous retuning of the capacity allocation plan. A high grade of reactiveness is needed. Agent based approaches and negotiation models, by decentralizing the decisional control and sim…

Process managementKnowledge managementComputer scienceProcess (engineering)business.industryMechanical Engineeringmedia_common.quotation_subjectComputer aided planningControl (management)Settore ING-IND/35 - Ingegneria Economico-GestionaleDecentralizationIndustrial and Manufacturing EngineeringNegotiationProduction planningmulti-agent systemProduction (economics)IDEF3distributed manufacturingbusinessRepresentation (mathematics)Settore ING-IND/16 - Tecnologie E Sistemi Di Lavorazionemedia_common
researchProduct